Filtered view

Owners

Every guide in the Knowledge Base filed under these tags. Clear the filter to see the full index.

25 records

Live
Latest entry
Page
01 / 03
Coverage
SEQ + Hervey Bay
  1. Field guides8 min read

    Construction Site Progress Photos: What to Capture at Each Stage, and Where Photos Fall Short

    Progress photos are the cheapest record of a build, and most people take them badly. What to photograph  at each Queensland build stage, how to keep...

  2. Checklists & templates6 min read

    Before You Cut: Identifying Load-Bearing Walls and Locating Pipes Underground in an Existing Queensland Home

    Most renovation surprises hide inside the walls and under the ground. The clues to a load-bearing wall, how to find pipes underground, and a checklist that...

  3. Field guides6 min read

    Renovating a Queenslander: Raising, Restumping and Building In Underneath Without Losing the Character, or the Ceiling Height

    Raising a Queenslander and building in underneath adds space without losing the yard. Check the character overlay, work out the ceiling height you need, and record...

  4. Field guides7 min read

    How to Plan a Home Extension in Queensland: Feasibility, Design, Approvals and Build, in Order

    Most extension budgets blow out before the build starts. The eight stages of planning a home extension in Queensland, in order, from feasibility and design to...

  5. Field guides6 min read

    How to Read House Plans: Floor Plans, Electrical, Hydraulic and Framing Sheets Explained

    Most owners sign a contract after a quick look at the floor plan. How to read the full set: scale and dimensions, floor plan symbols, the...

  6. Checklists & templates7 min read

    Practical Completion in Queensland: The Defects Document and a Room-by-Room Handover Checklist

    Practical completion starts the defect clocks and usually triggers the final payment. Walk the house room by room, leave with a signed defects document, and diary...

  7. Field guides7 min read

    Signing an HIA or QBCC Building Contract in Queensland: The Clauses to Read Before Cooling-Off Ends

    You usually get five business days after signing to walk away from a Queensland building contract. The clauses to read before that window closes, from allowances...

  8. Locations5 min read

    LiDAR Capture from the Sunshine Coast to Hervey Bay: Planning a Site Scan on Coastal, Hinterland and Acreage Blocks

    Can you get to me before the plasterboard goes on? How dispatch works from the Sunshine Coast to Gympie and Hervey Bay, and what coastal, hinterland...

  9. Locations5 min read

    Reality Capture in Hervey Bay: Recording a Fraser Coast Build When You Can't Be There

    Building on the Fraser Coast from somewhere else? A frame-stage capture lets you walk through the walls, rough-ins and tie-downs from wherever you are, before the...

  10. Field guides5 min read

    The Custom Home Design Process: Five Points Where Reality Capture Protects the Design, from Site to Handover

    The most expensive decisions in an architect-designed home end up hidden behind the linings. Here are the five points between brief and handover where a dated...

  11. Locations3 min read

    Reality Capture in Redlands and the Bay Islands: Cleveland, Russell, Macleay and North Stradbroke

    On the islands, the crossing sets the day. How captures are planned from Cleveland and Redland Bay to Russell, Macleay, Lamb, Karragarra and Straddie.

  12. Locations3 min read

    Reality Capture in Aura and Kawana: Catching the Frame Before the Plasterboard

    The gap between rough-in and plasterboard can be a day or two. Enter your linings date and see exactly when to book the frame record.

// Information hubIndex online
LAT 26.65°S · LON 153.09°EAEST --:--:--

Filtered view

Owners

Every guide in the Knowledge Base filed under these tags. Clear the filter to see the full index.