// Technical brief

[ Northern run protocol ]

LAT 25.29°S · LON 152.85°E AEST

[ Regional spotlight 03 ] Hervey Bay & the Fraser Coast // Owners & builders

Reality Capture in Hervey Bay: Recording a Fraser Coast Build When You Can't Be There

Building on the Fraser Coast from somewhere else? A frame-stage capture lets you walk through the walls, rough-ins and tie-downs from wherever you are, before the plasterboard covers them.

Published
Updated
Read
5 min
Region
Fraser Coast
File
HB-7760
Hervey Bay site · owner awayNorthern run
FRAME ON THE COAST · OWNER SOMEWHERE ELSETHE BAYHERVEY BAY · FRAME STAGESCHEDULED NORTHERN RUNOWNER · INTERSTATEWALKS THE FRAME IN A BROWSERHOSTED
Illustrative · not to scale · architectural-grade capture, not a survey
In this guide7 sections · 5 min read
  1. 01Building on the Fraser Coast from somewhere else
  2. 02What a frame-stage capture shows you from afar
  3. 03How capture reaches Hervey Bay: scheduled northern runs
  4. 04Coastal Hervey Bay: salt air and exposed lots
  5. 05Maryborough's older homes and the Urangan marina
  6. 06Before the run: what to organise from afar
  7. 07Reality capture in Hervey Bay: FAQs
// Module index · 07 modules
  1. MOD 01Building on the Fraser Coast from somewhere else
  2. MOD 02What a frame-stage capture shows you from afar
  3. MOD 03How capture reaches Hervey Bay: scheduled northern runs
  4. MOD 04Coastal Hervey Bay: salt air and exposed lots
  5. MOD 05Maryborough's older homes and the Urangan marina
  6. MOD 06Before the run: what to organise from afar
  7. MOD 07Reality capture in Hervey Bay: FAQs

Some of the homes going up around Hervey Bay belong to owners who aren't there to watch them being built. Some are relocating from Brisbane or interstate, some are working away, and some are building a retirement home they won't move into for a year. They all have the same question: how do you see inside the walls of a house you can't get to before the plasterboard covers them?

Reality capture in Hervey Bay answers it with a frame-stage record you can walk through from anywhere. This guide covers what that record shows, how captures reach the Fraser Coast on our scheduled northern runs, what coastal lots and older homes need, and what to organise from afar so the capture happens on time.

Building on the Fraser Coast from somewhere else

When you can't visit the site, you rely on the builder's progress photos and updates. They're useful, but a photo only shows what the camera was pointed at. The things owners most often want to check (where the ensuite waste is, whether the island power is where the kitchen plan says, which conduits were left for solar) are inside the walls and floor, and they disappear at the plasterboard stage.

A frame-stage capture records the whole house at that point: every wall, rough-in and fixing, measured and photographed, as a hosted 3D walkthrough you open in a browser. You can walk through it from Brisbane, Melbourne or the other side of the world, and share the link with family, your designer or the builder.

What a frame-stage capture shows you from afar

The plan below is a typical single-storey Fraser Coast home. Select a tag to see what the frame-stage record shows in that part of the house, then switch to "Plasterboard on" to see what you'd find on a site visit a few weeks later.

X-ray plan // frame stage vs plasterboard on

Walk the frame from wherever you are.

A typical single-storey Fraser Coast home. Select a tag to see what the frame-stage record shows there, then switch to Plasterboard on to see what's left to see a few weeks later.

Floor plan · 4-bed home
Floor plan of a single-storey four-bedroom homeA double garage and entry at the front, the main bedroom with ensuite and walk-in robe, a fourth bedroom, laundry, bathroom, two bedrooms at the back left and open-plan kitchen, living and dining at the back. At frame stage the plan shows water, waste and power runs, the switchboard, tie-downs and bracing; with plasterboard on, the walls are solid and the services are hidden. Six numbered tags mark the kitchen island, ensuite, laundry, switchboard, TV wall and an external wall.GARAGEENTRYBED 1ENSWIRBED 4LDRYBATHHALLBED 2BED 3KITCHENLIVING · DINING↑ SOLAR CONDUIT123456

Frame-stage record: services, tie-downs and bracing

Tag 01 · Kitchen

Kitchen and island

In the frame-stage record
Water, waste and power positions at the island and the sink, and the cabinet layout they were roughed in for.
Why it matters from afar
If the island moves or the cabinetmaker measures differently, you can check the rough-ins against the plan from wherever you are.

How capture reaches Hervey Bay: scheduled northern runs

Every capture is dispatched from our Sunshine Coast base. Hervey Bay, Maryborough and the rest of the Fraser Coast are covered by scheduled northern runs, with captures grouped so each run reaches as many sites as possible.

That makes timing the main thing to plan. The capture has to happen after the rough-ins are finished and before the plasterboard goes on, and the earlier we know those dates, the easier it is to fit your site into a run that lands in that window. If the builder's dates move, tell us as soon as you know.

Coastal Hervey Bay: salt air and exposed lots

Along the Esplanade and the bayside suburbs, salt air and wind are the two things to think about. Tie-downs, straps and connectors hold the roof on in a blow, and fixings near the coast are often specified with heavier corrosion protection. Both are easy to check at frame stage and impossible to see afterwards, so they're worth having in the record. Our guide to planning a site scan from the Sunshine Coast to Hervey Bay covers coastal, hinterland and acreage blocks in more detail.

Maryborough's older homes and the Urangan marina

Not every Fraser Coast job is a new build. Maryborough has many older Queenslanders and heritage-listed buildings, and renovating them starts with a record of what's there. For places on the Queensland Heritage Register, the archival recording requirements apply statewide, and our heritage brief explains how 3D capture feeds the measured drawings those approvals ask for.

On the water, the boatyards and marina at Urangan see refits and repowers. Our marine refit brief covers capturing engine rooms, lazarettes and tanks before parts are made.

Before the run: what to organise from afar

Because you won't be there on the day, the capture depends on a few things being arranged in advance: a site contact, the frame-stage date, access, and a list of anything you particularly want recorded. Tick them off below and the booking button sends them with your request.

The record itself is a hosted 3D walkthrough. A Pre-Plaster Build Audit includes six months of hosting, after which the tour is archived and can be reinstated on request. If you want offline files as well, MatterPak™ is available as an optional paid add-on.

Nearby service areas: Maryborough heritage homes · Gympie and the Mary Valley · Sunshine Coast to Hervey Bay · every service area

From afar // before the northern run

Arrange it from afar, tick it off here.

Six things to sort out when you can't be there. Tick what's done; the button books the northern run and sends your list with the request.

Owner off site · Fraser CoastScheduled northern run

0 / 6 arranged

Every booking is confirmed by our team. Architectural-grade capture, not a survey.

Reality capture in Hervey Bay: FAQs

Q.01

Do you come to Hervey Bay and Maryborough?

Yes. Hervey Bay, Maryborough and the Fraser Coast are covered by scheduled northern runs from our Sunshine Coast base.

Q.02

I live interstate. Do I need to be on site for the capture?

No. The builder or their site contact lets us in, and the hosted walkthrough is sent to you afterwards, so you can walk through the frame from wherever you are.

Q.03

How far ahead should I book?

As soon as you know when the rough-ins will be finished and when the plasterboard is booked. More notice gives more options for fitting your site into a northern run.

Q.04

Can I share the walkthrough with my family or designer?

Yes. The hosted walkthrough is a link that opens in a browser, so you can share it with family, your designer or the builder while it's hosted.

Q.05

What happens to the record after six months?

With a Pre-Plaster Build Audit, the tour is hosted for six months and then archived. Archived tours can be reinstated on request, and MatterPak™ offline files are an optional paid add-on.

Call[ Book ]