Updates2 min read
[ LOG ] Dispatch log
LOG-0002--:--:-- AEST

Updates2 min read

Inside the walls: what a frame-stage capture records, and how you use it

For a few days in every build, everything that will later be hidden is on show. What a frame-stage capture  records, what you get, and how it's used after the plasterboard goes on.

Inside the walls: what a frame-stage capture records, and how you use it
Inside the walls: what a frame-stage capture records, and how you use it

For a few days in every build, everything that will later be hidden is on show: the studs and noggings, the pipes and cables, the waste outlets in the slab. Then the plasterboard goes on, and for the rest of the house's life, finding any of it means guessing, or cutting. A frame-stage capture records that window so it can be opened again later.

What it records

  • The frame. Every stud, nogging and plate, including the fixing points you'll want for a TV bracket, shelving or grab rails.
  • The rough-ins. Plumbing, electrical, data and air-conditioning runs, in position and to scale.
  • The slab. Waste pipes, floor wastes and conduit stubs before flooring and cabinetry cover them.
  • The wet areas. Mixers, drainage lines and noggings before the waterproofing goes on.

What you get

A walkable 3D model of the house at frame stage, room by room, that opens in a browser from a link. There's nothing to install. You can move through each room, look at any wall bay up close and take reference measurements on screen: how far the pipe is from the corner, how high the cable runs, where the nearest nogging sits.

How it gets used

Mostly in small moments. Hanging something heavy and finding the nogging first time. Drilling for a towel rail without hitting a water line. Sending a plumber a snapshot of the wall before they quote, so they turn up knowing where to cut. And in bigger ones: a leak behind a finished wall that can be traced to one spot instead of three exploratory holes, or a renovation that starts with the walls already understood. Our guide Before You Cut covers what else to check before anyone opens a wall.

When to book it

The window opens once the frame and rough-ins are finished and signed off, and closes when the sheeting starts. That can be a matter of days, so ask your builder for both dates early and book as soon as you have them. Included hosting keeps the walkthrough live for 6 months; after that it's archived and can be brought back online on request.

Book a frame-stage captureown

More from the log

Open the full log →
  1. LOG-0001

    Storm season 2026–27: record your home before December

    Queensland's storm season runs from October to April. Here's what to do this week, and why a dated record of  your home before the first storm...

Planning a build or a renovation?Read the field guides